top of page
Anchor 1
Legacy Loop Trail Master Plan and Final Design
Location: Colorado Springs, CO
Client: City of Colorado Springs
Status: Constructed
Timeframe: January 2016-November 2017
While working for a prior employer, Jon Altschuld led the visualization efforts for the Legacy Loop Trail Master Plan and Final Design. More specifically, Jon helped the design team explore multiple trailhead design options through 3D modeling during the design process.
bottom of page