top of page
Anchor 1
Pedestrian Suspension Bridge and Trail
Location: Jefferson County, CO
Client: Hamon Construction, Amec Foster Wheeler, THK
Status: Complete
Timeframe: February 2018
As part of a team pursuing the Peaks-2-Plains design build project, Chinook collected 3D data for the site of a proposed pedestrian suspension bridge. Chinook then modeled the proposed trail and bridge without any design drawings or plans. Chinook also collected 3D data of a historic flume structure for use in its restoration and re-use.
The entire process, from flying the site to final graphics, took less than 2 days. In addition to the renderings, 3D models of the existing site and proposed design were showcased at the project interview.
Interactive 3D Model
(historic flume)
bottom of page