top of page
Anchor 1

Legacy Loop Trail Master Plan and Final Design

Location: Colorado Springs, CO

Client: City of Colorado Springs

Status: Constructed

Timeframe: January 2016-November 2017

More

While working for a prior employer, Jon Altschuld led the visualization efforts for the Legacy Loop Trail Master Plan and Final Design. More specifically, Jon helped the design team explore multiple trailhead design options through 3D modeling during the design process.

bottom of page