top of page
Anchor 1

Pedestrian Suspension Bridge and Trail

Location: Jefferson County, CO

Client: Hamon Construction, Amec Foster Wheeler, THK

Status: Complete

Timeframe: February 2018

More

As part of a team pursuing the Peaks-2-Plains design build project, Chinook collected 3D data for the site of a proposed pedestrian suspension bridge. Chinook then modeled the proposed trail and bridge without any design drawings or plans. Chinook also collected 3D data of a historic flume structure for use in its restoration and re-use.

 

The entire process, from flying the site to final graphics, took less than 2 days. In addition to the renderings, 3D models of the existing site and proposed design were showcased at the project interview.

Interactive 3D Model

(historic flume)

bottom of page